Toll road construction is one type of development that requires AMDAL. The AMDAL document already lists the possible impacts of development, assessment of impacts and efforts to overcome and prevent impacts. With floods still occurring on the toll road, it is necessary to evaluate the implementation of the Amdal at the Cikampek toll road crossection. This study aims to evaluate the planning and implementation of the crossection drainage volume contained in the Cikampek toll road AMDAL, especially at km 19-21 (2015 to 2020), evaluate toll road drainage channels at km 19-21 in terms of volume and system, and evaluate the implementation RPL and RKL on the Cikampek toll road.
kata kunci :
AMDAL document, Cross section drainage channel, flood on the Cikampek Toll road